Pre-adjudicate NIST 800-53 control implementations against your connected evidence.
RMF Pre-Adjudication (Growth tier and above) analyzes NIST SP 800-53 Rev 5 control implementations using a model trained on your labeled examples. Packages move through states (Draft, Analyzing, Analyzed, Assessed, Ready for Review). Admins can upload training examples — in bulk via CSV or one at a time — and retrain the model once enough examples exist; a status banner shows the example count, last-trained time, and model fit.
Open RMF Pre-Adjudication from the sidebar.
Click New Package to start a package, or open an existing one to view its analysis.
(Admin) Click Upload Examples to add labeled training data, by CSV or as a single example.
(Admin) Once at least 20 examples exist, click Retrain Model to rebuild it.
Lock a package for review when its analysis is ready; locked packages can't be edited further.
Jump straight to the feature, or browse the rest of the guides.